Holland Tunnel

Tunnels Construction 








The Holland Tunnel is a vehicular tunnel under the Hudson River. It connects Manhattan in New York City, New York, to the east, and Jersey City, New Jersey, to the west. An integral conduit within the New York metropolitan area, the Holland Tunnel is operated by the Port Authority of New York and New Jersey (PANYNJ). The tunnel carries Interstate 78; the New Jersey side is also designated the eastern terminus of Route 139.

Holland TunnelPlans for a fixed vehicular crossing over the Hudson River were first devised in 1906. However, disagreements prolonged the planning process until 1919, when it was decided to build a tunnel under the river. Construction of the Holland Tunnel started in 1920, and it opened in 1927. At the time of its opening, the Holland Tunnel was the longest continuous underwater vehicular tunnel in the world. The Holland Tunnel is one of three vehicular crossings between Manhattan and New Jersey, the others being the Lincoln Tunnel and the George Washington Bridge.

The Holland Tunnel was originally known as the Hudson River Vehicular Tunnel or the Canal Street Tunnel. It was renamed the Holland Tunnel in memory of Clifford Milburn Holland, the chief engineer, following his sudden death in 1924, but before the tunnel was opened. The Holland Tunnel was the world's first mechanically ventilated tunnel; the ventilation system was designed by Ole Singstad, who oversaw the tunnel's completion.

The first bid for constructing the Hudson River Tunnel, a contract for digging two of the tunnel's eight planned shafts, was advertised in September 1920. A groundbreaking for the Hudson River Tunnel's ventilation shaft, which marked the official start of construction on the tunnel, occurred on October 12, 1920, at Canal and Washington Streets on the Manhattan side. However, further construction of the Hudson River Tunnel was soon held up due to concerns over its ventilation system. There was also a dispute over whether the New York City government should pay for street-widening projects on the New Jersey side. Further delays arose when the New York and New Jersey tunnel commissions could not agree over which agency would award the contract to build the construction and ventilation shafts. More details